(Step 3: finish roof & floor)

Category: CONSTRUCT
Difficulty: (construction)
Time: 180 m minutes
Required terrain: . half-built reinforced concrete floor
Result: . reinforced concrete floor
Tools required:
> 1 tool with smoothing quality of 2 or more
> concrete mixer (50 charges)
Components required:
> 6 concrete
> 3 water